Water board reviews $10.35M biosolids dewatering design
The Water Sewer Commission reviewed a $10.35 million biosolids dewatering system design for the wastewater treatment facility. Tighe & Bond consultant Ryan Siegel presented the proposal, noting existing buildings may require partial demolition and reconstruction. The expanded project scope requires